Hardin Switch 345 kV (AE2-216)

Hardin Switch 345 kV is a 55.0 MW battery interconnection project in Hardin, Ohio with a current status of suspended.

55.0 MWCapacity
SuspendedStatus
Market
BatteryTechnology

Project facts

Canonical nameHardin Switch 345 kV
Queue IDAE2-216
Statussuspended
Source statusSuspended
Market
TechnologyBattery
Capacity55.0 MW
StateOhio
CountyHardin
Point of interconnection
Requested (queue) date2019-03-21
Proposed in-service date2026-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectsuspendedhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.