Hare Switching Station 115 (FEUS-1)

Hare Switching Station 115 is a 60.0 MW gas interconnection project in Bloomfield, New Mexico with a current status of active. It is proposed to connect at Hare Switching Station 115.

60.0 MWCapacity
ActiveStatus
NMMarket
GasTechnology

Project facts

Canonical nameHare Switching Station 115
Queue IDFEUS-1
Statusactive
Source statusIA PENDING
MarketNM
TechnologyGas
Capacity60.0 MW
StateNew Mexico
CountyBloomfield
Point of interconnectionHare Switching Station 115
Requested (queue) date2024-05-27
Proposed in-service date2027-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerFEUS

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata