FEUS — Interconnection Queue Projects

FEUS is associated with 5 tracked interconnection projects representing 445 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

5Projects
5Active
0Operational
0Withdrawn
445 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Gas5445 MW

Geographic footprint

StateProjects
New Mexico5

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Hogback to West Loop 115 T-LineFEUS-3Gas180.0 MWactiveKirtland, New Mexico
Glade to El Paso 115 T-Line (south of Switch 2165)FEUS-5Gas85.0 MWactiveLa Plata, New Mexico
Hood Mesa to Fruitland Tap 115 T-LineFEUS-2Gas60.0 MWactiveKirtland, New Mexico
Hare Switching Station 115FEUS-1Gas60.0 MWactiveBloomfield, New Mexico
West Fork Substation 115FEUS-4Gas60.0 MWactiveBloomfield, New Mexico

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through FEUS.

Start tracking with interXdata