Harrigan Hill Wind (0296)

Harrigan Hill Wind is a 100.5 MW wind interconnection project in Clinton-Ellenburg, New York with a current status of withdrawn. It is proposed to connect at Lyon Mt - Willis 115kV.

100.5 MWCapacity
WithdrawnStatus
DMarket
WindTechnology

Project facts

Canonical nameHarrigan Hill Wind
Queue ID0296
Statuswithdrawn
Source status0
MarketD
TechnologyWind
Capacity100.5 MW
StateNew York
CountyClinton-Ellenburg
Point of interconnectionLyon Mt - Willis 115kV
Requested (queue) date2008-05-12
Proposed in-service date2009-07-31
Operational date
Withdrawn date
DeveloperNoble Environmental Power, LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.