Harrisburg Substation 115 kV-12.47 kV (L0587)
Harrisburg Substation 115 kV-12.47 kV is a 14.0 MW other interconnection project in Linn, Oregon with a current status of active. It is proposed to connect at BPA's Harrisburg Substation.
14.0 MWCapacity
ActiveStatus
ORMarket
OtherTechnology
Project facts
| Canonical name | Harrisburg Substation 115 kV-12.47 kV |
|---|---|
| Queue ID | L0587 |
| Status | active |
| Source status | CONST AGRMT EXE |
| Market | OR |
| Technology | Other |
| Capacity | 14.0 MW |
| State | Oregon |
| County | Linn |
| Point of interconnection | BPA's Harrisburg Substation |
| Requested (queue) date | 2023-12-04 |
| Proposed in-service date | 2026-12-05 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Consumers Power, Inc. |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata