Harry Allen (7082_7)

Harry Allen is a 223.5 MW gas interconnection project in Clark, Nevada with a current status of operational.

223.5 MWCapacity
OperationalStatus
NEVPMarket
GasTechnology

Project facts

Canonical nameHarry Allen
Queue ID7082_7
Statusoperational
Source status(OP) Operating
MarketNEVP
TechnologyGas
Capacity223.5 MW
StateNevada
CountyClark
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2011-05-01
Withdrawn date
Developer
Utility / transmission ownerNevada Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata