Harryette 12kV (AC1-124)

Harryette 12kV is a 1.0 MW battery interconnection project in Guernsey, Ohio with a current status of withdrawn.

1.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameHarryette 12kV
Queue IDAC1-124
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity1.0 MW
StateOhio
CountyGuernsey
Point of interconnection
Requested (queue) date2016-10-27
Proposed in-service date2017-10-01
Operational date
Withdrawn date2017-07-20
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata