Hartland 12.47 kV (AG2-075)

Hartland 12.47 kV is a 3.0 MW solar interconnection project in Fayette, Ohio with a current status of withdrawn.

3.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameHartland 12.47 kV
Queue IDAG2-075
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity3.0 MW
StateOhio
CountyFayette
Point of interconnection
Requested (queue) date2021-01-19
Proposed in-service date2022-09-14
Operational date
Withdrawn date2021-03-22
Developer
Utility / transmission ownerPPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.