Hartwell Lake is a 85.0 MW other interconnection project in Hart, Georgia with a current status of operational.

85.0 MWCapacity
OperationalStatus
SEPAMarket
OtherTechnology

Project facts

Canonical nameHartwell Lake
Queue ID754_3
Statusoperational
Source status(OA) Out of service but expected to return to service in next calendar year
MarketSEPA
TechnologyOther
Capacity85.0 MW
StateGeorgia
CountyHart
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1962-04-01
Withdrawn date
Developer
Utility / transmission ownerUSCE-Savannah District

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata