Harvest Hills Solar 2 (1238)

Harvest Hills Solar 2 is a 100.0 MW other interconnection project in Cayuga County, New York with a current status of withdrawn. It is proposed to connect at Wright Avenue - Milliken 115kV line.

100.0 MWCapacity
WithdrawnStatus
CMarket
OtherTechnology

Project facts

Canonical nameHarvest Hills Solar 2
Queue ID1238
Statuswithdrawn
Source status0
MarketC
TechnologyOther
Capacity100.0 MW
StateNew York
CountyCayuga County
Point of interconnectionWright Avenue - Milliken 115kV line
Requested (queue) date2021-08-25
Proposed in-service date2024-07-31
Operational date
Withdrawn date
DeveloperConnectGen Cayuga County LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.