Harvey Solar (69796_HARVS)
Harvey Solar is a 350.0 MW solar interconnection project in Licking, Ohio with a current status of active.
350.0 MWCapacity
ActiveStatus
PJMMarket
SolarTechnology
Project facts
| Canonical name | Harvey Solar |
|---|---|
| Queue ID | 69796_HARVS |
| Status | active |
| Source status | (T) Regulatory approvals received. Not under construction |
| Market | PJM |
| Technology | Solar |
| Capacity | 350.0 MW |
| State | Ohio |
| County | Licking |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | 2028-08-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Leeward Asset Management, LLC |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | active | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata