Haywood Farm Solar (61255_HAY02)

Haywood Farm Solar is a 4.9 MW solar interconnection project in Montgomery, North Carolina with a current status of operational.

4.9 MWCapacity
OperationalStatus
CPLEMarket
SolarTechnology

Project facts

Canonical nameHaywood Farm Solar
Queue ID61255_HAY02
Statusoperational
Source status(OP) Operating
MarketCPLE
TechnologySolar
Capacity4.9 MW
StateNorth Carolina
CountyMontgomery
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2017-08-01
Withdrawn date
Developer
Utility / transmission ownerCD Global Solar Holdings, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata