Heartland Wind Livingston (L13_CE27)

Heartland Wind Livingston is a 225.0 MW wind interconnection project in Livingston, Illinois with a current status of withdrawn.

225.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameHeartland Wind Livingston
Queue IDL13_CE27
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity225.0 MW
StateIllinois
CountyLivingston
Point of interconnection
Requested (queue) date2004-01-18
Proposed in-service date2006-10-30
Operational date
Withdrawn date2005-10-03
Developer
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.