Hecate Energy Jamaica Wind (30INR0003)

Hecate Energy Jamaica Wind is a 1,029.4 MW other interconnection project in Galveston, Texas with a current status of operational. It is proposed to connect at 42000 P. H. Robinson 345kV.

1,029.4 MWCapacity
OperationalStatus
GalvestonMarket
OtherTechnology

Project facts

Canonical nameHecate Energy Jamaica Wind
Queue ID30INR0003
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketGalveston
TechnologyOther
Capacity1,029.4 MW
StateTexas
CountyGalveston
Point of interconnection42000 P. H. Robinson 345kV
Requested (queue) date2023-06-28
Proposed in-service date
Operational date2030-06-01
Withdrawn date
DeveloperHecate Energy
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata