Helen Solar CSG (62706_SC)

Helen Solar CSG is a 4.0 MW solar interconnection project in McLeod, Minnesota with a current status of operational.

4.0 MWCapacity
OperationalStatus
MISOMarket
SolarTechnology

Project facts

Canonical nameHelen Solar CSG
Queue ID62706_SC
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologySolar
Capacity4.0 MW
StateMinnesota
CountyMcLeod
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2020-07-01
Withdrawn date—
Developer—
Utility / transmission ownerAltus Power America Management, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata