Henderson 161kV (J2932)
Henderson 161kV is a 100.0 MW battery interconnection project in Henderson, Kentucky with a current status of withdrawn. It is proposed to connect at Henderson 161kV.
100.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology
Project facts
| Canonical name | Henderson 161kV |
|---|---|
| Queue ID | J2932 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Battery |
| Capacity | 100.0 MW |
| State | Kentucky |
| County | Henderson |
| Point of interconnection | Henderson 161kV |
| Requested (queue) date | 2022-09-14 |
| Proposed in-service date | 2025-10-01 |
| Operational date | 2025-10-01 |
| Withdrawn date | 2023-03-24 |
| Developer | — |
| Utility / transmission owner | BIG RIVERS ELECTRIC CORPORATION |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata