Henrietta Peaker (55807_HPP1)

Henrietta Peaker is a 49.0 MW gas interconnection project in Kings, California with a current status of operational.

49.0 MWCapacity
OperationalStatus
CISOMarket
GasTechnology

Project facts

Canonical nameHenrietta Peaker
Queue ID55807_HPP1
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologyGas
Capacity49.0 MW
StateCalifornia
CountyKings
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2002-06-01
Withdrawn date—
Developer—
Utility / transmission ownerMRP San Joaquin Energy LLC.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.