Hereford Northeast 115kV substation (GEN-2017-058)

Hereford Northeast 115kV substation is a 135.0 MW solar interconnection project in Deaf Smith County, Texas with a current status of withdrawn. It is proposed to connect at Hereford Northeast 115kV substation.

135.0 MWCapacity
WithdrawnStatus
TXMarket
SolarTechnology

Project facts

Canonical nameHereford Northeast 115kV substation
Queue IDGEN-2017-058
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologySolar
Capacity135.0 MW
StateTexas
CountyDeaf Smith County
Point of interconnectionHereford Northeast 115kV substation
Requested (queue) date2017-05-29
Proposed in-service date
Operational date
Withdrawn date2021-04-23
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.