Herman Substation (L0442)
Herman Substation is a 38.7 MW other interconnection project in Adams, Washington with a current status of withdrawn. It is proposed to connect at Hatton Tap 8/9.
38.7 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology
Project facts
| Canonical name | Herman Substation |
|---|---|
| Queue ID | L0442 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | WA |
| Technology | Other |
| Capacity | 38.7 MW |
| State | Washington |
| County | Adams |
| Point of interconnection | Hatton Tap 8/9 |
| Requested (queue) date | 2018-03-22 |
| Proposed in-service date | 2021-10-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Big Bend Electric Cooperative, Inc. |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata