Herman Substation (L0442)

Herman Substation is a 38.7 MW other interconnection project in Adams, Washington with a current status of withdrawn. It is proposed to connect at Hatton Tap 8/9.

38.7 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology

Project facts

Canonical nameHerman Substation
Queue IDL0442
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyOther
Capacity38.7 MW
StateWashington
CountyAdams
Point of interconnectionHatton Tap 8/9
Requested (queue) date2018-03-22
Proposed in-service date2021-10-01
Operational date
Withdrawn date
DeveloperBig Bend Electric Cooperative, Inc.
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.