Hertlein Road-Winburne 34 kV is a 15.0 MW solar interconnection project in Clearfield, Pennsylvania with a current status of withdrawn.

15.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameHertlein Road-Winburne 34 kV
Queue IDAF1-095
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity15.0 MW
StatePennsylvania
CountyClearfield
Point of interconnection
Requested (queue) date2019-08-30
Proposed in-service date2023-01-01
Operational date
Withdrawn date2019-10-02
Developer
Utility / transmission ownerPENELEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.