HHGT repower Horse13+CallD (17INR0053)

HHGT repower Horse13+CallD is a 44.0 MW other interconnection project in Taylor, Texas with a current status of operational. It is proposed to connect at 7046 Kendal 345kV.

44.0 MWCapacity
OperationalStatus
TaylorMarket
OtherTechnology

Project facts

Canonical nameHHGT repower Horse13+CallD
Queue ID17INR0053
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketTaylor
TechnologyOther
Capacity44.0 MW
StateTexas
CountyTaylor
Point of interconnection7046 Kendal 345kV
Requested (queue) date2016-10-03
Proposed in-service date
Operational date2026-12-31
Withdrawn date
DeveloperNextera
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.