High Bridge Battery (0784)

High Bridge Battery is a 5.0 MW battery interconnection project in Chenango, New York with a current status of withdrawn. It is proposed to connect at E. Norwich - Jennison 115kV.

5.0 MWCapacity
WithdrawnStatus
EMarket
BatteryTechnology

Project facts

Canonical nameHigh Bridge Battery
Queue ID0784
Statuswithdrawn
Source status0
MarketE
TechnologyBattery
Capacity5.0 MW
StateNew York
CountyChenango
Point of interconnectionE. Norwich - Jennison 115kV
Requested (queue) date2018-12-11
Proposed in-service date2024-06-30
Operational date
Withdrawn date
DeveloperHigh Bridge Wind, LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.