High Noon Solar (24INR0124)

High Noon Solar is a 182.0 MW solar interconnection project in Hill, Texas with a current status of operational. It is proposed to connect at Tap 138kV 445 Yates - 444 Covington.

182.0 MWCapacity
OperationalStatus
HillMarket
SolarTechnology

Project facts

Canonical nameHigh Noon Solar
Queue ID24INR0124
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketHill
TechnologySolar
Capacity182.0 MW
StateTexas
CountyHill
Point of interconnectionTap 138kV 445 Yates - 444 Covington
Requested (queue) date2021-11-03
Proposed in-service date
Operational date2028-05-09
Withdrawn date
DeveloperHigh Noon Solar Project, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.