High Plains Storage (24INR0419)

High Plains Storage is a 157.7 MW other interconnection project in Harris, Texas with a current status of operational. It is proposed to connect at 45880 Hockley 138kV.

157.7 MWCapacity
OperationalStatus
HarrisMarket
OtherTechnology

Project facts

Canonical nameHigh Plains Storage
Queue ID24INR0419
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketHarris
TechnologyOther
Capacity157.7 MW
StateTexas
CountyHarris
Point of interconnection45880 Hockley 138kV
Requested (queue) date2022-09-02
Proposed in-service date
Operational date2028-05-30
Withdrawn date
DeveloperROBP Holdings, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata