Highland-Lordstown 1 & 2 345 kV (AE1-213)

Highland-Lordstown 1 & 2 345 kV is a 1,170.0 MW gas interconnection project in Trumbull, Ohio with a current status of withdrawn.

1,170.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology

Project facts

Canonical nameHighland-Lordstown 1 & 2 345 kV
Queue IDAE1-213
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyGas
Capacity1,170.0 MW
StateOhio
CountyTrumbull
Point of interconnection—
Requested (queue) date2018-09-26
Proposed in-service date2023-11-01
Operational date—
Withdrawn date2018-10-01
Developer—
Utility / transmission ownerATSI

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata