Hilken 230kV (GEN-2016-052)

Hilken 230kV is a 3.3 MW wind interconnection project in Burleigh, North Dakota with a current status of withdrawn. It is proposed to connect at Hilken 230kV.

3.3 MWCapacity
WithdrawnStatus
NDMarket
WindTechnology

Project facts

Canonical nameHilken 230kV
Queue IDGEN-2016-052
Statuswithdrawn
Source statusWITHDRAWN
MarketND
TechnologyWind
Capacity3.3 MW
StateNorth Dakota
CountyBurleigh
Point of interconnectionHilken 230kV
Requested (queue) date2016-03-28
Proposed in-service date
Operational date
Withdrawn date2019-12-02
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.