Hillcrest 345 kV (AG2-359)

Hillcrest 345 kV is a 125.0 MW battery interconnection project in Brown, Ohio with a current status of withdrawn.

125.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameHillcrest 345 kV
Queue IDAG2-359
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity125.0 MW
StateOhio
CountyBrown
Point of interconnection
Requested (queue) date2021-03-26
Proposed in-service date2024-11-15
Operational date
Withdrawn date2024-12-18
Developer
Utility / transmission ownerDEOK

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.