Hillsboro-Clinton 138kV (AC2-061)

Hillsboro-Clinton 138kV is a 117.0 MW solar interconnection project in Ross, Ohio with a current status of operational.

117.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameHillsboro-Clinton 138kV
Queue IDAC2-061
Statusoperational
Source statusIn Service
Market
TechnologySolar
Capacity117.0 MW
StateOhio
CountyRoss
Point of interconnection
Requested (queue) date2017-02-17
Proposed in-service date
Operational date2025-05-30
Withdrawn date
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata