Hillsdale North 230 kV (J1517)

Hillsdale North 230 kV is a 40.0 MW battery interconnection project in Vermillion, Indiana with a current status of withdrawn. It is proposed to connect at Hillsdale North 230 kV.

40.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameHillsdale North 230 kV
Queue IDJ1517
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity40.0 MW
StateIndiana
CountyVermillion
Point of interconnectionHillsdale North 230 kV
Requested (queue) date2020-06-18
Proposed in-service date2023-10-02
Operational date2023-10-02
Withdrawn date2023-07-17
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata