Hilltop Power (61788_WT)

Hilltop Power is a 2.0 MW wind interconnection project in Pipestone, Minnesota with a current status of operational.

2.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameHilltop Power
Queue ID61788_WT
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyWind
Capacity2.0 MW
StateMinnesota
CountyPipestone
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2008-12-01
Withdrawn date—
Developer—
Utility / transmission ownerHilltop Power, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.