Hilo 115 kV Switch (J858)

Hilo 115 kV Switch is a 140.0 MW solar interconnection project in Bradley County, Arkansas with a current status of withdrawn. It is proposed to connect at Hilo 115 kV Switch.

140.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameHilo 115 kV Switch
Queue IDJ858
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity140.0 MW
StateArkansas
CountyBradley County
Point of interconnectionHilo 115 kV Switch
Requested (queue) date2017-06-16
Proposed in-service date2019-09-29
Operational date2019-09-29
Withdrawn date2017-09-01
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.