Hinton 46kV (I22)

Hinton 46kV is a 41.0 MW other interconnection project in Summers, West Virginia with a current status of withdrawn.

41.0 MWCapacity
WithdrawnStatus
Market
OtherTechnology

Project facts

Canonical nameHinton 46kV
Queue IDI22
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyOther
Capacity41.0 MW
StateWest Virginia
CountySummers
Point of interconnection
Requested (queue) date2002-07-31
Proposed in-service date2004-09-01
Operational date
Withdrawn date2003-11-04
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata