Hitchland 345 kV Substation (GEN-2023-SR8)

Hitchland 345 kV Substation is a 200.0 MW battery interconnection project in Gruver, Texas with a current status of active. It is proposed to connect at Hitchland 345 kV Substation.

200.0 MWCapacity
ActiveStatus
TXMarket
BatteryTechnology

Project facts

Canonical nameHitchland 345 kV Substation
Queue IDGEN-2023-SR8
Statusactive
Source statusIA FULLY EXECUTED/ON SCHEDULE
MarketTX
TechnologyBattery
Capacity200.0 MW
StateTexas
CountyGruver
Point of interconnectionHitchland 345 kV Substation
Requested (queue) date2023-02-13
Proposed in-service date2026-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerXcel/SPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata