Hitchland 345kV (GEN-2002-008)

Hitchland 345kV is a 240.0 MW wind interconnection project in Hansford County, Texas with a current status of operational. It is proposed to connect at Hitchland 345kV.

240.0 MWCapacity
OperationalStatus
TXMarket
WindTechnology

Project facts

Canonical nameHitchland 345kV
Queue IDGEN-2002-008
Statusoperational
Source statusIA FULLY EXECUTED/COMMERCIAL OPERATION
MarketTX
TechnologyWind
Capacity240.0 MW
StateTexas
CountyHansford County
Point of interconnectionHitchland 345kV
Requested (queue) date2002-07-19
Proposed in-service date
Operational date2007-11-01
Withdrawn date
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata