Hitchland 345kV (GEN-2021-SR5)

Hitchland 345kV is a 126.0 MW battery interconnection project in Hansford, Texas with a current status of withdrawn. It is proposed to connect at Hitchland 345kV.

126.0 MWCapacity
WithdrawnStatus
TXMarket
BatteryTechnology

Project facts

Canonical nameHitchland 345kV
Queue IDGEN-2021-SR5
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologyBattery
Capacity126.0 MW
StateTexas
CountyHansford
Point of interconnectionHitchland 345kV
Requested (queue) date2021-05-07
Proposed in-service date
Operational date
Withdrawn date2021-08-17
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.