Hitchland 345kV (GEN-2026-PR4)

Hitchland 345kV is a 131.6 MW battery interconnection project in Spearman, Texas with a current status of active. It is proposed to connect at Hitchland 345kV.

131.6 MWCapacity
ActiveStatus
TXMarket
BatteryTechnology

Project facts

Canonical nameHitchland 345kV
Queue IDGEN-2026-PR4
Statusactive
Source statusSPECIAL STUDY
MarketTX
TechnologyBattery
Capacity131.6 MW
StateTexas
CountySpearman
Point of interconnectionHitchland 345kV
Requested (queue) date2025-12-19
Proposed in-service date2027-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.