Hitchland - Moore 230 kV (GEN-2022-112)

Hitchland - Moore 230 kV is a 370.0 MW other interconnection project in Hansford And Sherman, Texas with a current status of withdrawn. It is proposed to connect at Hitchland - Moore 230 kV.

370.0 MWCapacity
WithdrawnStatus
TXMarket
OtherTechnology

Project facts

Canonical nameHitchland - Moore 230 kV
Queue IDGEN-2022-112
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologyOther
Capacity370.0 MW
StateTexas
CountyHansford And Sherman
Point of interconnectionHitchland - Moore 230 kV
Requested (queue) date2023-02-04
Proposed in-service date2026-07-31
Operational date
Withdrawn date2023-11-06
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata