HMV Minster Energy Storage System (60299_MIN02)

HMV Minster Energy Storage System is a 7.0 MW battery interconnection project in Auglaize, Ohio with a current status of suspended.

7.0 MWCapacity
SuspendedStatus
PJMMarket
BatteryTechnology

Project facts

Canonical nameHMV Minster Energy Storage System
Queue ID60299_MIN02
Statussuspended
Source status(OS) Out of service and NOT expected to return to service in next calendar year
MarketPJM
TechnologyBattery
Capacity7.0 MW
StateOhio
CountyAuglaize
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2016-03-01
Withdrawn date
Developer
Utility / transmission ownerSummit Ridge Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectsuspendedhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.