Hobbs - LCEC West 115 kV Line (GEN-2024-261)

Hobbs - LCEC West 115 kV Line is a 140.0 MW solar interconnection project in Lea, New Mexico with a current status of operational. It is proposed to connect at Hobbs - LCEC West 115 kV Line.

140.0 MWCapacity
OperationalStatus
NMMarket
SolarTechnology

Project facts

Canonical nameHobbs - LCEC West 115 kV Line
Queue IDGEN-2024-261
Statusoperational
Source statusDISIS STAGE
MarketNM
TechnologySolar
Capacity140.0 MW
StateNew Mexico
CountyLea
Point of interconnectionHobbs - LCEC West 115 kV Line
Requested (queue) date2025-03-01
Proposed in-service date
Operational date2029-09-01
Withdrawn date
Developer
Utility / transmission ownerLCEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata