LCEC — Interconnection Queue Projects

LCEC is associated with 2 tracked interconnection projects representing 290 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

2Projects
0Active
1Operational
1Withdrawn
290 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Solar2290 MW

Geographic footprint

StateProjects
New Mexico2

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Lea County 115 kV SubstationGEN-2024-011Solar150.0 MWwithdrawnLea, New Mexico
Hobbs - LCEC West 115 kV LineGEN-2024-261Solar140.0 MWoperationalLea, New Mexico

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through LCEC.

Start tracking with interXdata