LCEC — Interconnection Queue Projects
LCEC is associated with 2 tracked interconnection projects representing 290 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
2Projects
0Active
1Operational
1Withdrawn
290 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 2 | 290 MW |
Geographic footprint
| State | Projects |
|---|---|
| New Mexico | 2 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Lea County 115 kV Substation | GEN-2024-011 | Solar | 150.0 MW | withdrawn | Lea, New Mexico |
| Hobbs - LCEC West 115 kV Line | GEN-2024-261 | Solar | 140.0 MW | operational | Lea, New Mexico |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through LCEC.
Start tracking with interXdata