Holiday Hill Community Wind (535)
Holiday Hill Community Wind is a 5.0 MW wind interconnection project in Hampden, Massachusetts with a current status of operational. It is proposed to connect at WMECo 23 kV line 19J1 adjacent to Pine Hill Road in the town of Russell, Massachusetts.
5.0 MWCapacity
OperationalStatus
WMAMarket
WindTechnology
Project facts
| Canonical name | Holiday Hill Community Wind |
|---|---|
| Queue ID | 535 |
| Status | operational |
| Source status | C |
| Market | WMA |
| Technology | Wind |
| Capacity | 5.0 MW |
| State | Massachusetts |
| County | Hampden |
| Point of interconnection | WMECo 23 kV line 19J1 adjacent to Pine Hill Road in the town of Russell, Massachusetts |
| Requested (queue) date | 2015-02-27 |
| Proposed in-service date | — |
| Operational date | 2020-01-07 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata