Holliston 130 - EMA ASO is a 5.0 MW battery interconnection project in Middlesex, Massachusetts with a current status of withdrawn. It is proposed to connect at Eversource Holliston 130.

5.0 MWCapacity
WithdrawnStatus
BOSTMarket
BatteryTechnology

Project facts

Canonical nameHolliston 130 - EMA ASO
Queue ID1213
Statuswithdrawn
Source statusW
MarketBOST
TechnologyBattery
Capacity5.0 MW
StateMassachusetts
CountyMiddlesex
Point of interconnectionEversource Holliston 130
Requested (queue) date2022-01-14
Proposed in-service date2023-11-30
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.