Holt County 345kV Substation (GEN-2018-014)

Holt County 345kV Substation is a 74.1 MW wind interconnection project in Holt, Missouri with a current status of withdrawn. It is proposed to connect at Holt County 345kV Substation.

74.1 MWCapacity
WithdrawnStatus
MOMarket
WindTechnology

Project facts

Canonical nameHolt County 345kV Substation
Queue IDGEN-2018-014
Statuswithdrawn
Source statusWITHDRAWN
MarketMO
TechnologyWind
Capacity74.1 MW
StateMissouri
CountyHolt
Point of interconnectionHolt County 345kV Substation
Requested (queue) date2018-04-27
Proposed in-service date2024-12-30
Operational date
Withdrawn date2023-04-27
Developer
Utility / transmission ownerTMO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.