Hondo Arroyo Solar (27INR0301)

Hondo Arroyo Solar is a 60.4 MW solar interconnection project in Medina, Texas with a current status of operational. It is proposed to connect at Tap 138 kV 5225 Hondo - 5813 Pearson .

60.4 MWCapacity
OperationalStatus
MedinaMarket
SolarTechnology

Project facts

Canonical nameHondo Arroyo Solar
Queue ID27INR0301
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketMedina
TechnologySolar
Capacity60.4 MW
StateTexas
CountyMedina
Point of interconnectionTap 138 kV 5225 Hondo - 5813 Pearson
Requested (queue) date2024-06-13
Proposed in-service date
Operational date2028-07-01
Withdrawn date
DeveloperHondo Creek Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.