Hood Mesa to Fruitland Tap 115 T-Line (FEUS-2)
Hood Mesa to Fruitland Tap 115 T-Line is a 60.0 MW gas interconnection project in Kirtland, New Mexico with a current status of active. It is proposed to connect at Hood Mesa to Fruitland Tap 115 T-Line.
60.0 MWCapacity
ActiveStatus
NMMarket
GasTechnology
Project facts
| Canonical name | Hood Mesa to Fruitland Tap 115 T-Line |
|---|---|
| Queue ID | FEUS-2 |
| Status | active |
| Source status | IA FULLY EXECUTED/ON SCHEDULE |
| Market | NM |
| Technology | Gas |
| Capacity | 60.0 MW |
| State | New Mexico |
| County | Kirtland |
| Point of interconnection | Hood Mesa to Fruitland Tap 115 T-Line |
| Requested (queue) date | 2025-02-21 |
| Proposed in-service date | 2026-10-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | FEUS |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | active | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata