Hoopeston Wind LLC (59021_HOO1)

Hoopeston Wind LLC is a 98.0 MW wind interconnection project in Vermilion, Illinois with a current status of operational.

98.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameHoopeston Wind LLC
Queue ID59021_HOO1
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyWind
Capacity98.0 MW
StateIllinois
CountyVermilion
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2015-03-01
Withdrawn date—
Developer—
Utility / transmission ownerHoopeston Wind LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.