Hoosac Wind Project CNR Only (539)

Hoosac Wind Project CNR Only is a 28.5 MW wind interconnection project in Franklin, Massachusetts with a current status of operational. It is proposed to connect at Hoosac 69 kV Substation.

28.5 MWCapacity
OperationalStatus
WMAMarket
WindTechnology

Project facts

Canonical nameHoosac Wind Project CNR Only
Queue ID539
Statusoperational
Source statusC
MarketWMA
TechnologyWind
Capacity28.5 MW
StateMassachusetts
CountyFranklin
Point of interconnectionHoosac 69 kV Substation
Requested (queue) date2015-03-02
Proposed in-service date
Operational date2016-01-19
Withdrawn date
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.