Hoosier's Sandborn - Grain Processing Center 161kV (GPC Primary - Sandborn Primary) (J3136)

Hoosier's Sandborn - Grain Processing Center 161kV (GPC Primary - Sandborn Primary) is a 100.0 MW solar interconnection project in Daviess, Indiana with a current status of withdrawn. It is proposed to connect at Hoosier's Sandborn - Grain Processing Center 161kV (GPC Primary - Sandborn Primary).

100.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameHoosier's Sandborn - Grain Processing Center 161kV (GPC Primary - Sandborn Primary)
Queue IDJ3136
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity100.0 MW
StateIndiana
CountyDaviess
Point of interconnectionHoosier's Sandborn - Grain Processing Center 161kV (GPC Primary - Sandborn Primary)
Requested (queue) date2022-09-13
Proposed in-service date2026-11-01
Operational date2026-11-01
Withdrawn date2025-10-27
Developer
Utility / transmission ownerHoosier Energy

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata