Hoot Lake Battery Energy Storage System (E0005)

Hoot Lake Battery Energy Storage System is a 90.7 MW battery interconnection project in Otter Tail, Minnesota with a current status of active. It is proposed to connect at Hoot Lake 115 kV Substation.

90.7 MWCapacity
ActiveStatus
MISOMarket
BatteryTechnology

Project facts

Canonical nameHoot Lake Battery Energy Storage System
Queue IDE0005
Statusactive
Source statusactive
MarketMISO
TechnologyBattery
Capacity90.7 MW
StateMinnesota
CountyOtter Tail
Point of interconnectionHoot Lake 115 kV Substation
Requested (queue) date2025-08-06
Proposed in-service date2028-05-04
Operational date
Withdrawn date
DeveloperOtter Tail Power Company
Utility / transmission ownerOtter Tail Power Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.