HOPSLAM BESS (23INR0220)

HOPSLAM BESS is a 151.1 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at 38430 White Baker TNP 138kV.

151.1 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameHOPSLAM BESS
Queue ID23INR0220
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyBattery
Capacity151.1 MW
State
County
Point of interconnection38430 White Baker TNP 138kV
Requested (queue) date2021-03-16
Proposed in-service date2025-09-20
Operational date
Withdrawn date
DeveloperMomentum LRC Holdco LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.